Kaleshwaram Project, Link – IV, Package 10
Kaleshwaram Project, Link – IV, Package 10
Kaleshwaram Project, Link – IV, Package 10 at a value of Rs.865 Crores approx.
Image Gallery
Highlights of Project
Underground pump house of 135x22x54 Mts.
Asia’s Largest Circular Surge Pool of 56 dia * 92 depth mts.
Motors Capacity: 4 nos (106 MW each).
Pump Capacity: 4 nos (80.33 cumecs each).
Dynamic Head: 101.20 m.
Construction of NOF Dam for a length of 412 Mts.
Construction of a new Reservoir of 3.5 TMC Capacity.
Command Area development for an Ayacut of 30000 Acre.